Specialists of the HV line service of the Central Production Department (PD) of Orenburgenergo, a branch of IDGC of Volga, PJSC (a member of Rosseti Group of Companies), completed capital repairs of Kuvandyk-Dubenskaya OHL, a 110 kV overhead transmission line. Electricians replaced twelve reinforced concrete supports, ensured alignment of tower bodies, inspected wires and overhead ground-wire cables in order to reduce the risk of OHL damages in autumn and winter season 2017/2018. T
his line serves as a power transmission link between central and eastern districts of the Orenburg region, and feeds into a substation operated by Russian Railways, JSC. Besides, this power transmission line provides electricity for Sludnaya Gora, a gypsum stone minefield.
"Capital repair of Kuvandyk-Dubenskaya 110 kV OHL will ensure a reliable power supply for facilities connected to it, and will contribute to stable operations of the entire power grid of the Orenburg region", commented Aleksandr Sukhodub, head of the HV line service of the Central Production Department (PD) of Orenburgenergo branch.
|